“We were devastated in the Summer of 2023 to find that a fire had took hold within our school, resulting in the loss of our nursery setting. The fire not only damaged the foundations of the building, but it also claimed all of the nursery furniture and equipment. 

From start to finish the team from Corrigo sensitively supported the Leadership Team on the journey to begin to rebuild the nursery, whilst ensuring that the children’s education did not suffer. They did this through quickly installing temporary classrooms and promptly starting work, after planning the structure of the rebuild with the Leadership Team.  

Steve Halmshaw, Operations Manager and his Team worked closely with the school's Leadership Team every step of the way to ensure that our vision for the rebuild was sensitively met, whilst continuously solving problems with innovative solutions. 

We are profoundly grateful to have worked with Corrigo as due to their, professionalism, and care the Corrigo's Team have not only created a bright, welcoming space but a learning environment that is safe and nurturing. We are profoundly grateful to everyone involved in rebuild of our nursery setting.”   

Brougham Primary School
AdAstra Academy Trust.

 

A construction worker wearing a white safety helmet, yellow high-visibility vest, gray gloves, and a harness is working with a power tool in an industrial warehouse. The workspace has tools, equipment, and machinery, with boxes and pallets in the background.

“Back in August 2024 our school was hit with a substantial 2nd floor roof leak which caused damage throughout all 3 floors of our school building, Corrigo were appointed to assist the academy from disaster recovery point through to a return of full site operation. 

We were very pleased with all service provided by Corrigo throughout the 14 months spent on site, From the outset Corrigo their team of workers and Operations manager Steve Halmshaw were professional, reliable and had a strong ethos to have the academy functionating day to day with minimal disruptions.  

All works were completed on site in line with the school's requirements and health and safety practices ensuring areas were adequately segregated from school use and contractor use. 

The project undertaken involved setting up a 14 classroom mobile village on our rear playground while undertaking works on the 3 floors required simultaneously ensure minimal disruption to the school and its operations at all times Corrigo and their staff could not be faulted in their efforts to ensure all the schools needs were considered and where required task were undertaking in a careful and considerate manor.  

The project was completed ahead of deadlines agreed without compromising on quality and disruption cause to the academy. 

We would not hesitate to recommend the services of Corrigo.”   

Brougham Primary School
AdAstra Academy Trust.

Inside a factory with large industrial machinery, pipes, stairs, and walkways, with a few workers wearing safety gear.

“I have had the pleasure of working with Graham & his team at Corrigo for the past 7 years. They have undertaken engineering projects at Coveris from relocating a whole factory including modifications to suit our own, installation of various machinery both large and small, modifications to existing machinery, planned preventative maintenance and emergency maintenance works.

From the very beginning, they were professional, responsive, knowledgeable and above all flexible.

What stood out for me was their ability to problem solve & attention to detail. They helped to make the whole process run smoothly and stress-free.

I would highly recommend Graham & the Corrigo team to anyone looking for engineering expertise & services. As the work undertaken was within our budget and delivered on time.

I’ll definitely be using them again in the future.”

Steve O’Hare
Operations Director, Coveris.